Mooring Buoy Fabrication, Transportation, Offshore Installation to Support Drilling and Production Operation in the Blocks 05-1b & 05-1c

Project – SVB ST-01 Mooring Buoy

20221118_134743097_iOS
z3672679818557_3f5a8dd576f2d6f80fb8a03383b3cc41
20220823_022516257_iOS
z3672679818557_3f5a8dd576f2d6f80fb8a03383b3cc41
20221118_134743088_iOS
20221118_134743099_iOS
20220824_011217656_iOS
z3664594995904_6fde7be9bcd916e02019a2eab999cdbe
20221118_134743100_iOS
20221118_134743101_iOS
20221118_134743102_iOS
20221118_134743097_iOS z3672679818557_3f5a8dd576f2d6f80fb8a03383b3cc41 20220823_022516257_iOS z3672679818557_3f5a8dd576f2d6f80fb8a03383b3cc41 20221118_134743088_iOS 20221118_134743099_iOS 20220824_011217656_iOS z3664594995904_6fde7be9bcd916e02019a2eab999cdbe 20221118_134743100_iOS 20221118_134743101_iOS 20221118_134743102_iOS

COMPANY

Idemitsu Gas Production Co. Ltd. (“IGP”)

WORKS

  1. Fabrication of new mooring buoy
  2. Transportation and Offshore Installation for Mooring Buoy

Worksite

Offshore installation site in Sao Vang and Dai Nguyet field

Project Background

The SAO VANG (SV) and DAI NGUYET (DN) discoveries are located in the central to west area of Blocks 05-1b and 05-1c in the Nam Con Son basin, offshore Vietnam and approximately 350 km southeast of Vung Tau City, in water depths of 113m (LAT) for SAO VANG and 116m (LAT) for DAI NGUYET.

The development of SV & DN field is based upon the installation of two wellhead platforms. There will be a manned central processing platform at SV (SV-CPP) and a normally unmanned platform at DN (DN WHP). Wells at both fields will be gas condensate producers with surface trees. Initially 5 wells are planned for SV and 4 wells for DN with the possibility of additional infill wells to be drilled later.

Company is building and will assume operatorship for a gas-condensate Central Processing Platform (CPP) and Wellhead Platform (WHP) in Sao Vang (SV) and Dai Nguyet (DN) fields respectively in Nam Con Son basin offshore Vietnam. As part Drilling and Production activities, Company is endeavour to have a contract of provision of Mooring Buoy and associated services readied and fully functional in mid of July 2019