FPSO PTSC LAM SON – LAM SON JOC

A. Introduction

Lam Son Joint Operating Company (Lam Son JOC ) was established following a Petroleum Contract being signed between PetroVietnam (PVN) and Petronas Carigali Overseas Sdn. Bhd (PCOSB) on 7th January 2003, providing for Lam Son JOC to conduct petroleum exploration within Blocks 01/97 & 02/97 in the Cuu Long Basin, offshore southern Vietnam.

The original contract area of Blocks 01/97 & 02/97 was 11,900 Sq. km. At the end of the exploration phase Lam Son JOC relinquished area where commercial oil and gas were not discovered (about 98.9% of original contract area). The remaining areas were 115.81 sq.km for TL- DD field and 13.88 Sq.km for Ho Xam South Field.

Thang Long – Dong Do oil field is geographically located in the north-eastern part of the Cuu Long Basin and lies approximately 160 km East of Vung Tau City. Water depths across the development are around 70m.

B. FPSO Information

The Terminal consists of the FPSO PTSC-LAM SON, with the major particulars as follows:

NoDescriptionInformation
1IMO number9071806
2Name of shipPTSC Lam Son
3OwnerPTSC Asia Pacific
4Call sign9V6691
5FlagSingapore
6MMSI566888000
7Gross tonnage53829 T
8DWT96125.7 T
9Cargo Tank capacity exc Slops104416.5 Cu. Meters (98%)
10Length overall243.25 m
11Breadth moulded41.8 m
12Depth moulded20 m

C. Terminal Limit, Navigation Guidelines:

Terminal Limits

The Thang Long – Dong Do Field facilities are in the following co-ordinates:

THANG LONG WHP 10°09’31.212”N
108°34’30.412”E

DONG DO WHP 10°07’00.194”N
108°33’44.176”E

FPSO PTSC LAM SON 10°08’02.508”N
108°34’03.253”E

Safety Zones :

There are Safety Zones established in principle:

  • 1/ A prohibited area has been established 200 meter either side of subsea pipelines
  • 2/ Areas formed by extending 500m from outer edges of THANG LONG WHP, DONG DO WHP.
  • 3/ Areas formed by 1,200 m radius from the mooring turret

Vessels shall not enter these areas without the permission of OIM.

Marine Exclusion Zone:

The area has been closed zone by three circles with 2 nautical miles radius and centrals at FPSO PTSC LAM SON, THANG LONG WHP, DONG DO WHP:

Facility Latitude Longitude
FPSO PTSC LAM SON 10°08’02.508”N 108°34’03.253”E
THANG LONG WHP 10°09’31.212”N 108°34’30.412”E
DONG DO WHP 10°07’00.194”N 108°33’44.176”E

Anchoring of Vessels in this area is strictly prohibited.

Anchorage Area:

For Export Tankers requesting to anchor, the recommended area is located southeast of the field and formed circular by the centre point with coordinates: 10°04’00”N – 108°37’00”E:

This area represents a circled shape with one nautical mile radius. Holding/anchoring ground within this predetermined area is considered good. Anchoring within the Marine Exclusion Zone is strictly prohibited. The sea water depth around the area is approximately 68 m or 223 feet.

D. Recommendations For Tanker Approaching FPSO PTSC LAM SON For Offloading Operation:

  • Contact Terminal for permission to enter MEZ at least 10 NM away from FPSO on VHF CH 67; FPSO’s Call Sign: PTSC LAM SON.
  • Without Mooring Master on board, all vessels are requested to keep a safe distance (at least 2 NM) from the installations within MEZ (see attached sketch):
  • A mooring team of 5 to 6 persons will come on board Export Tanker for offloading operation. Before the team coming aboard, to save time for preparation the following should be ready:
    • Pilot combination ladder on lee side (agreed with Operation Supervisor or Mooring Master); height: 1.5m over sea level.
    • Ship crane: to pick up the toolbox from Supply Boat. Crane runner must be connected by a stinger with safety latch hook (length: 2.0-3.0m) and tag lines in case of bad weather.
    • Oxygen analyzer: to check oxygen in loading tanks before offtake under the witness of Mooring Master or his delegate.
    • Deployment of Tanker’s messenger line: 24-36 mm diam. x 220 M rope to be arranged (see attached Sketch) for Boatless Hose Transfer. The Aft maindeck windlass (in front of Accommodation Block) must be empty and ready to heave.
    • On Forecastle: winch drum with direct lead to the 76mm chain stopper must be empty to accept a 220 metres of 24-36mm messenger and 150 metres of 72mm pick-up line of the tandem mooring system. Just a short messenger 24-36mm x 30-50m to be connected to winch drum and ready to use. 1 crowbar, 1 hammer to be ready.
    • On poop deck: Aft poop deck windlass, 2 heaving lines, 1 chain stopper, 1 plier, 1 crowbar, 1 hammer must be ready for picking up towing pendant wire.
  • In case of bad weather and request of deviation is granted, the pilot boarding ground is Mui Vung Tau (10°15’N; 107°05’E). Please contact Vung Tau Port Control on VHF 16/09 from distance 24NM, 12 NM, 6 NM to the POB point for more information and instructions.
Preparation For Boatless Cargo Hose Transfer
Preparation For Boatless Cargo Hose Transfer
Thang Long - Dong Do Field Marine Exclusion Zone
Thang Long – Dong Do Field Marine Exclusion Zone

Download Document

WARNING:

* All information of our projects are issued and permitted to post on this website by the Terminal Operators or our Clients. MM Marine is not responsible for any errors, omissions and consequences of the accuracy of these documents. The map, diagrams included are for reference only, they should not be used for ship’s navigation to approach, inbound/outbound or transiting Terminal areas